Case Studies | SupplyChainBrain
Webinars
Podcasts
Videos
Events
Subscribe
Sign In
Logistics
Air Cargo
All Logistics
Facility Location Planning
Freight Forwarding/Customs Brokerage
Global Gateways
Global Logistics
Last Mile Delivery
Logistics Outsourcing
LTL/Truckload Services
Ocean Transportation
Parcel & Express
Rail & Intermodal
Reverse Logistics
Service Parts Management
Transportation & Distribution
Technology
All Technology
Artificial Intelligence
Cloud & On-Demand Systems
Data Management (Big Data/IoT/Blockchain)
ERP & Enterprise Systems
Forecasting & Demand Planning
Global Trade Management
Inventory Planning/Optimization
Product Lifecycle Management
Robotics
Sales & Operations Planning
SC Finance & Revenue Management
SC Planning & Optimization
Supply Chain Visibility
Transportation Management
General SCM
Business Strategy Alignment
Customer Relationship Management
Education & Professional Development
Global Supply Chain Management
Global Trade & Economics
Green Energy
HR & Labor Management
Quality & Metrics
Regulation & Compliance
Sourcing/Procurement/SRM
SC Security & Risk Mgmt
Supply Chains in Crisis
Sustainability & Corporate Social Responsibility
Warehousing
All Warehouse Services
Conveyors & Sortation
Lift Trucks & AGVs
Order Management & Fulfillment
Packaging
RFID, Barcode, Mobility & Voice
Warehouse Automation
Warehouse Management Systems
Industries
Aerospace & Defense
Apparel
Automotive
Chemicals & Energy
Consumer Packaged Goods
E-Commerce/Omni-Channel
Food & Beverage
Healthcare
High-Tech/Electronics
Industrial Manufacturing
Pharmaceutical/Biotech
Retail
Think Tank
Case Studies: Page 30
Precise Tracking for Warranty Claims Among Broad Array of Failures
Turn-Key Distribution Case Study
EDI and Web-portal Deployment Case Study
Electronics Packaging Case Study
Audiovox Foreign Trade Zone Case Study
MD Express Expedited Shipping Case Study
White-Glove Delivery Case Study
Pharmaceutical Packaging Case Study
Pharmaceutical Warehousing Case Study
Cost Avoidance and Proactive Support Keeps Client's End-Users Loyal
Challenge: The latest roll out of a manufacturer's best selling point-of-sale product was exhibiting failure in the field due to a problem with a proprietary application-specific integrated circuit (ASIC). Renova Technology alerted the engineering staff and the manufacturer made the decision to order a redesign of this very costly ASIC chip. In the meantime, 20,000 completed units awaiting distribution had the potential to fail immediately upon installation.
Service Provider's Flexibility Keeps Client's Customer Satisfaction High
Challenge: A model of LCD monitors sold to a self-maintainer exhibited multiple permutations of three different design failures emanating from three different areas in the units. Though the manufacturer's customer normally repaired their own equipment, they required the manufacturer to perform repair on this particular model.
Repair Provider and Contract Manufacturer Work Together to Reduce Costs
Challenge: A Fortune 500 manufacturer required a reduction in turnaround time and shipping and administrative costs when claiming warranty on units manufactured overseas by a contract manufacturer.
Previous Page
Page 30 of 55
Next Page
Sign me up!
Receive the latest supply chain trends, news and analysis from SupplyChainBrain.
Email Address
*
Sign Up
Featured Product
Case Studies
Case Studies
How a Leading U.S. Floral Distribution Company Reduced Warehouse Labor Costs by 45% with RFID
Case Studies
Recycled Tagging Fasteners: Small Changes Make a Big Impact
Case Studies
Enhancing High-Value Electronics Shipment Security with Tive's Real-Time Tracking
Case Studies
Moving Robots Site-to-Site